Category: Institutional

BIAL Garden Pavilion

THE CHALLENGES PROJECT DETAILS Client: Bengalore International Airport Limited Location: Devanahalli, Bengaluru Surface Area: Completed: 50% done as at Jan 2023 Value: 18 Cr Architect: SOM LLC Façade Consultant: Design & Build by Milestone Scope of work: 1. Curved 150mm Aluminium Pipe External Façade 2. Curved 50mm Aluminium Pipe Internal Cladding 3. Structural Steel 4. [...]

KIA

THE CHALLENGES PROJECT DETAILS Client: SAFRICODE Location: Kolwezi, Democratic Republic of Congo Surface Area: Completed: 90% done as at Jan 2023 Value: 20 Cr Architect: ARCOP Associates Façade Consultant: Design & Build by Milestone Scope of work: 1. 800 Tonnes of Pre-Engineered Primary Steel 2. Standing seam roofing system 3. Multi-wall structural glazing system 4. [...]

Navodaya Medical College

THE CHALLENGES Understanding your manpower and cash issues can determine the success or failure of any project. Do not overestimate your capabilities or underestimate your cash flow.  Map out the details of all of the projects going on and what you are bidding that could happen in the near future.Inflexibility is another challenges. Map out [...]

KMC

THE CHALLENGES Integrating a horizontal louvre system within the punch window and lighting in the spider glazing. We achieved this with our engineering capabilities and now stands as a landmark building at Mangalore. PROJECT DETAILS Client: Manipal Hospital Location: Mangalore, Karnataka Surface Area: 2000 sqm Completed: 2015 Value: 2.5 Cr Architect: RSP Design Consultants Façade [...]

GAGAN

THE CHALLENGES Curvilinear structural glazing & Honeycomb Metal Cladding was new technology at the time, adapting our workforce to the new system was a challenge but yielded good results. The project got completed to the satisfaction of the clients and architects and stands without any maintenance for almost two decades. PROJECT DETAILS Client: BG Shirke [...]

BMS Admin

THE CHALLENGES Understanding your manpower and cash issues can determine the success or failure of any project. Do not overestimate your capabilities or underestimate your cash flow.  Map out the details of all of the projects going on and what you are bidding that could happen in the near future.Inflexibility is another challenges. Map out [...]